Underground Water sewerage scheme.
▣ Detailed Survey of area.
▣ Alignment survey of existing sewer network.
▣ Zoning of Entire town.
▣ Design of sewer collection network and sewerage system.
▣ Design of pumps, pumping main and pumping station.
▣ Design of treatment system including method of disposal of treated effluent.
▣ Deatiled working drawings and designs with speciations.
▣ Preparation of BOQ and estimates.
▣ Preparation of Bid Documents.